Plant Reconfiguration


Client: Vertex Pacific Limited - (formerly Carter Holt Harvey Plastic Products)
Duration: 11 months

  • Plant reconfigurationThe installation of three 11KV/400V 1MVA transformers.
  • Main switchboard, metering and mains cables to suit.
  • Install Power distribution infrastructure for injection moulders and blow-moulding machines.
  • Relocation of injection moulders to dairy clean room environment.
  • Relocation of blow-moulders to new manufacturing area.
  • Design, manufacture and installation of custom MCCs for the automatic control of chilled water, tower water, compressed air and air dryers etc..... Cabling, connecting and commisioning to completion.