PROJECT

Design and Build

Independent Extrusion Ltd
Hamilton
4 months
Installation of new extrusion plant

This work consisted of the installation of a new seven inch extrusion press, induction billet heater, extruded metal handling gear and also an ageing oven. This is the second extrusion plant Hennessy Electrical Engineering has installed for Inex.

Inex Extrusion Plant

Project
MilEstones

Design of Power Supply and Distribution.
Installation of 1 x 750KVA, 1 x 500 KVA and 1 x Delta/Delta 500 KVA transformer.
Main switchboards and Metering.
Mains cabling to suit load.
Site and Plant cabling, Field Instrumentation, Control Cabinets fit off and assistance with Commissioning.
Design and Build of Control System for Ageing Oven.
Electrical Installation and Wiring, PLC and LCD Screen for Operator Control.

Request Support

If you require support please call our freephone number 0800 243 243 or fill out the support request form below.

(For urgent support you may wish to call us on 0800 243 243)

© 2024 Hennessy Group Ltd
DuoDesign
envelopesmartphonecross linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram